VoiceAssist Production Readiness Checklist

Version: 1.0 Date: 2025-11-21 Phase: 14 - Production Deployment


Overview

This comprehensive checklist ensures all requirements are met before deploying VoiceAssist to production. Review each section and mark items as complete.

Deployment Date: **___** Reviewed By: **___** Approved By: **___**


1. Infrastructure ✅

Server Requirements

  • Ubuntu 22.04 LTS or later installed
  • Minimum 32 GB RAM (64 GB recommended)
  • Minimum 8 CPU cores (16 recommended)
  • Minimum 500 GB SSD storage (1 TB recommended)
  • Public static IP address assigned
  • Server hostname configured
  • Time zone set to UTC
  • NTP service enabled and syncing

Network Configuration

  • Domain name registered
  • DNS A record configured (domain → server IP)
  • DNS propagation verified (dig/nslookup)
  • Firewall configured (ports 80, 443, 22 only)
  • Outbound internet access verified
  • Network bandwidth adequate (minimum 100 Mbps)

Security Hardening

  • SSH key-based authentication configured
  • SSH password authentication disabled
  • Fail2ban installed and configured
  • UFW firewall enabled and configured
  • Automatic security updates enabled
  • System audit logging enabled (auditd)
  • Intrusion detection system configured (optional)

2. Software Prerequisites ✅

Required Software

  • Docker 24.0+ installed and running
  • Docker Compose 2.20+ installed
  • Git installed
  • Python 3.11+ installed
  • Nginx installed
  • Certbot installed (for Let's Encrypt)
  • OpenSSL installed

Optional Software

  • Terraform 1.5+ (for IaC)
  • Ansible 2.14+ (for automation)
  • kubectl (for Kubernetes deployment)

System Updates

  • All system packages updated (apt update && apt upgrade)
  • Kernel up to date
  • Security patches applied
  • Reboot performed after kernel updates

3. Application Configuration ✅

Environment Variables

  • .env file created from template
  • DOMAIN set to production domain
  • ENVIRONMENT=production set
  • LOG_LEVEL=INFO set
  • All CHANGE_ME placeholders replaced
  • File permissions set to 600 (.env)
  • File owned by root:root

Database Configuration

  • POSTGRES_USER configured
  • POSTGRES_PASSWORD set (16+ characters, strong)
  • POSTGRES_DB configured
  • DATABASE_URL constructed correctly
  • Database pool settings configured
  • Connection timeout configured

Redis Configuration

  • REDIS_HOST configured
  • REDIS_PORT configured
  • REDIS_PASSWORD set (16+ characters, strong)
  • REDIS_URL constructed correctly
  • Redis cache TTL configured
  • Max connections configured

Security Keys

  • SECRET_KEY generated (64 random characters)
  • JWT_SECRET_KEY generated (64 random characters)
  • ENCRYPTION_KEY generated (32 bytes, base64)
  • QDRANT_API_KEY generated
  • All keys stored securely
  • Keys documented in secure vault

External Services

  • OpenAI API key obtained and tested
  • OPENAI_API_KEY configured
  • SMTP credentials obtained
  • SMTP_HOST, SMTP_PORT, SMTP_USER, SMTP_PASSWORD configured
  • Email sending tested
  • Nextcloud credentials configured (if using)

4. SSL/TLS Configuration ✅

Certificate Setup

  • Let's Encrypt certificate obtained
  • Certificate installed in /etc/letsencrypt/live/
  • Certificate chain complete
  • Private key secured (permissions 600)
  • Auto-renewal configured (cron job)
  • Certificate expiry monitoring enabled

Nginx Configuration

  • Nginx configuration file created
  • HTTP to HTTPS redirect configured
  • TLS 1.2 and 1.3 enabled
  • Strong cipher suites configured
  • HSTS header configured
  • Security headers configured (X-Frame-Options, CSP, etc.)
  • Nginx configuration tested (nginx -t)
  • Nginx reloaded successfully

SSL Testing

  • SSL Labs test performed (Grade A or better)
  • Certificate valid and trusted
  • No mixed content warnings
  • HTTPS working on all endpoints

5. Database Setup ✅

PostgreSQL Configuration

  • PostgreSQL container running
  • Database created
  • User and permissions configured
  • Database migrations run (alembic upgrade head)
  • Migrations verified (\dt in psql)
  • Connection pooling configured
  • Replication configured (primary-replica)

Database Performance

  • Indexes created (15+ strategic indexes)
  • PostgreSQL tuning applied
  • shared_buffers configured (25% of RAM)
  • effective_cache_size configured (75% of RAM)
  • max_connections configured (200+)
  • Query performance profiling enabled

Database Backup

  • Backup script configured
  • Backup schedule set (daily at 2 AM)
  • Backup encryption configured (GPG)
  • Backup storage configured (S3 or local)
  • Backup retention policy set (30 days)
  • Initial backup performed and tested
  • Restore procedure documented and tested

6. Redis Configuration ✅

Redis Setup

  • Redis container running
  • Password authentication enabled
  • Persistence configured (AOF + RDB)
  • Maxmemory policy set (allkeys-lru)
  • Maxmemory limit configured (2 GB)
  • Redis connection tested

Redis Backup

  • AOF persistence enabled
  • RDB snapshots configured
  • Backup schedule configured
  • Restore procedure tested

7. Vector Database (Qdrant) ✅

Qdrant Setup

  • Qdrant container running
  • API key configured
  • Collections created
  • Storage volume mounted
  • Connection tested
  • Backup strategy defined

8. Monitoring & Observability ✅

Prometheus

  • Prometheus container running
  • Metrics endpoints exposed
  • Scrape configs configured
  • Alert rules configured
  • Retention policy set (30 days)
  • Prometheus accessible via nginx proxy

Grafana

  • Grafana container running
  • Admin password changed from default
  • Data sources configured (Prometheus, Loki)
  • Dashboards imported (7 dashboards)
  • SMTP configured for alerts
  • User accounts created
  • Grafana accessible via nginx proxy

Jaeger Tracing

  • Jaeger container running
  • OpenTelemetry instrumentation enabled
  • Traces being collected
  • Jaeger UI accessible

Loki Logging

  • Loki container running
  • Log aggregation configured
  • Retention policy set
  • Logs flowing from all services

AlertManager

  • AlertManager configured
  • PagerDuty integration configured
  • Slack integration configured
  • Email alerts configured
  • Alert routing configured
  • Test alerts sent and received

9. High Availability & Disaster Recovery ✅

PostgreSQL Replication

  • Primary PostgreSQL running
  • Replica PostgreSQL configured
  • Streaming replication active
  • Replication lag < 1 second
  • WAL archiving configured
  • Replication slots created
  • Failover procedure documented
  • Failover tested

Automated Backups

  • Daily backups scheduled (2 AM)
  • Backup encryption enabled (GPG)
  • Backup compression enabled
  • Backup verification enabled (weekly)
  • Off-site backup storage configured
  • Backup retention policy enforced (30 days)
  • Restore procedure tested successfully

Disaster Recovery

  • RTO documented (30 minutes)
  • RPO documented (< 1 minute)
  • Disaster recovery runbook created
  • Recovery procedures documented for 5 scenarios
  • DR testing schedule defined (quarterly)
  • Emergency contacts documented

10. Application Deployment ✅

Container Deployment

  • All containers built successfully
  • All containers running (docker-compose ps)
  • Health checks passing for all services
  • Container restart policies set (always)
  • Resource limits configured (CPU, memory)
  • Container logs configured (json-file, 10MB, 3 files)

Service Verification

  • API Gateway responding (/health)
  • Worker service running
  • All dependencies accessible (DB, Redis, Qdrant)
  • WebSocket connections working
  • File uploads working
  • Email sending working

Database Migrations

  • Migrations run successfully
  • Database schema verified
  • Test data created (if needed)
  • Data integrity verified

11. Security Hardening ✅

HIPAA Compliance

  • HIPAA compliance matrix reviewed (42/42 requirements)
  • PHI data encryption at rest enabled
  • PHI data encryption in transit (TLS 1.3)
  • Audit logging enabled
  • Access controls implemented (RBAC)
  • Business Associate Agreement (BAA) signed

Encryption

  • Encryption at rest configured (all data stores)
  • TLS 1.3 for all communications
  • mTLS for internal services (optional)
  • Key management configured (Vault or Secrets Manager)
  • Secrets never in version control

Network Security

  • Zero-trust network policies configured
  • NetworkPolicies applied (Kubernetes)
  • Firewall rules strict (deny all, allow specific)
  • DDoS protection enabled (Cloudflare or similar)
  • Rate limiting configured

Access Control

  • RBAC implemented (admin, user roles)
  • Strong password policy enforced
  • MFA available for users
  • API authentication required (JWT)
  • Token expiration configured (30 min access, 7 days refresh)
  • Session management configured

Security Scanning

  • Automated security audits enabled
  • Vulnerability scanning (Trivy)
  • Dependency scanning (Safety)
  • Code scanning (Bandit)
  • Container scanning
  • Security alerts configured

12. Testing & Validation ✅

Smoke Tests

  • Automated smoke tests run
  • All smoke tests passing
  • Health endpoints tested
  • SSL certificate tested
  • Database connectivity tested
  • Redis connectivity tested
  • Qdrant connectivity tested
  • API Gateway tested
  • Authentication tested
  • Monitoring endpoints tested

Integration Tests

  • Full test suite run (pytest)
  • E2E tests passing (20+ tests)
  • Voice interaction tests passing (10+ tests)
  • Integration tests passing (15+ tests)
  • Test coverage > 90%

Performance Tests

  • Load testing performed
  • API response time < 200ms (P95)
  • Throughput > 1000 req/s
  • Database queries optimized
  • Cache hit rate > 80%
  • No memory leaks detected

Security Tests

  • Penetration testing performed
  • Vulnerability scan completed
  • Security headers verified
  • CSRF protection tested
  • XSS protection tested
  • SQL injection tests passed

13. Documentation ✅

Technical Documentation

  • Architecture documentation updated
  • Deployment guide complete
  • Production runbook created
  • Disaster recovery runbook complete
  • RTO/RPO documentation complete
  • API documentation up to date
  • Database schema documented

Operational Documentation

  • Monitoring guide created
  • Troubleshooting guide complete
  • Maintenance procedures documented
  • Escalation procedures documented
  • Emergency contacts documented
  • Runbook procedures tested

User Documentation

  • User guide complete
  • Admin guide complete
  • FAQ created
  • Video tutorials (optional)
  • Change log maintained

14. Training & Handoff ✅

Team Training

  • Operations team trained on deployment
  • Operations team trained on monitoring
  • Operations team trained on disaster recovery
  • Support team trained on troubleshooting
  • Knowledge transfer sessions completed

Runbook Review

  • Deployment runbook reviewed with team
  • Disaster recovery runbook reviewed
  • Emergency procedures reviewed
  • Escalation path reviewed
  • On-call rotation established

15. Communication & Launch ✅

Pre-Launch Communication

  • Stakeholders notified of launch date
  • Users notified (if applicable)
  • Support team prepared
  • Status page prepared
  • Communication templates ready

Launch Plan

  • Launch time scheduled (low-traffic period)
  • Rollback plan documented
  • On-call team alerted
  • Monitoring dashboards open
  • Communication channels open (Slack, PagerDuty)

Post-Launch

  • System monitored for 24 hours post-launch
  • No critical issues detected
  • Performance metrics within targets
  • User feedback collected
  • Launch retrospective scheduled

HIPAA Compliance

  • HIPAA Security Rule compliance verified (all 42 requirements)
  • Business Associate Agreements signed
  • Risk assessment completed
  • Policies and procedures documented
  • Workforce training completed

Data Protection

  • GDPR compliance reviewed (if applicable)
  • Privacy policy updated
  • Data processing agreements signed
  • User consent mechanisms implemented
  • Data retention policies enforced

Audit Requirements

  • Audit logging enabled (7-year retention)
  • Access logs maintained
  • Change logs maintained
  • Compliance audit schedule established

Final Sign-Off

Deployment Approval

Infrastructure Lead: Name: ******_****** Signature: ******_****** Date: ******_******

Security Lead: Name: ******_****** Signature: ******_****** Date: ******_******

DevOps Lead: Name: ******_****** Signature: ******_****** Date: ******_******

Project Manager: Name: ******_****** Signature: ******_****** Date: ******_******

CTO/Engineering Director: Name: ******_****** Signature: ******_****** Date: ******_******


Post-Deployment Actions

After successful deployment:

  • Update status page to "Operational"
  • Announce launch to stakeholders
  • Monitor system for 48 hours
  • Schedule 1-week post-launch review
  • Schedule 1-month post-launch review
  • Update documentation based on lessons learned

Checklist Version: 1.0 Last Updated: 2025-11-21 Phase: 14 - Production Deployment Complete